Installation method and precautions of movable partition
1.Observe the construction environment
Up to now, surveying the construction environment is the most important thing. The main purpose of surveying the construction environment is to determine whether the site has installation conditions, record the position of the beams and columns on the roof, the position of the air-conditioning piping system, etc. to customize the final construction plan. The most suitable time for construction is when the site has not undergone any renovations.
2.Measurement and positioning
According to the construction drawing, release the position control line of the movable partition on the indoor floor, and lead the position line of the partition wall to the side wall and the ceiling. The installation position line of the fixing part should be ejected when the line is springed. The installation height of the track must be discussed with the construction team installing the ceiling, otherwise it will cause a lot of trouble.
3.Installation of steel structure and track fixings
The steel structure is a load-bearing structure that connects the roof and the track. The steel structure involves the safety of the entire movable partition system, so it must not be taken lightly. Explode screws on the roof of the building according to the construction drawings, and then weld the angle irons to fix them. According to the design requirements, select the track fixtures. Before installing the track, consider the closing method of the wall, ground, and ceiling and facilitate the installation of the movable partition wall. By calculating the weight of the movable partition wall, determine the load borne by the track and the specifications and fixing methods of the embedded parts. The embedded parts of the track should be installed firmly, the track and the main structure should be fixed firmly, and all metal parts should be treated with rust prevention.
4.Mounting rail
⑴Suspended track: The suspension guide is fixed by installing pulleys on the top surface of the partition and connecting with the upper suspended track. The track and pulley should be selected according to the size of the load. Light-weight movable partition wall, the track is fixed on the top wooden frame or steel frame with wood screws or butt screws. Heavy-duty movable partition wall, the track is fixed on the steel frame with butt screw or welding.
⑵Supporting track: The fixing method of the support guide is that the pulley is at the lower part of the partition and forms the lower support point with the ground track. The track is fixed with expansion bolts or embedded parts of the track, and a guide rail is installed on the top wooden frame.
⑶ When installing the track, install the pulley or the reserved opening of the track in advance according to the specific situation of the track (usually on the side of the wall 1/2 partition)
5.Install the movable panel
According to the installation method, accurately mark the pulley line on each panel, and then fix the fixing frame of the pulley on the upper or lower stile of the partition with screws. Then put the panels into the track one by one, adjust each panel to be perpendicular to the ground, and push and pull to rotate flexibly, and finally connect and fix each fan. Normally, adjacent panels are connected by hinges.
6.Finish
Finishing according to design requirements. Generally, soft packs, cold-mounted solid wood panels, veneer panels, inlaid glass, etc. are used. After finishing the finish, paint finishing or edge finishing should be carried out. The finishing construction shall be carried out in accordance with the requirements of the corresponding two standards.
7. Debug
After the movable panel is installed, details such as panel height and airtightness must be carried out.