Welcome to GreatFold - Making businesses better

cubicle partition toilet

  • cubicle partition toilet
  • cubicle partition toilet
  • cubicle partition toilet
  • cubicle partition toilet

cubicle partition toilet




Mastering the key points and finding the key points for the installation of toilet partitions can not only ensure that the partitions are not damaged during installation, but also try to quickly complete the installation tasks. So what are the key points of cubicle partition toilet installation?
  The key is to pop up accurate horizontal lines and vertical vertical lines on the base to control the position of the partition wall keel, the straightness of the keel and the fixed point.
  Key 2. The distance between the fixing points of the keels along the top and the ground should be no more than 1000mm, the ends of the keels must be fixed firmly, and the installation should meet the design requirements.
  The third key is to add 6# galvanized channel steel to the door opening and door frame of the lightweight partition wall, and the column should reach the bottom of the floor. If a new door opening is added to the original partition wall, 6# galvanized channel steel should also be added to the door frame, and the galvanized channel steel should be painted three times with anti-rust paint and three times with fire-resistant paint.
  Key 4. The gypsum board should be laid vertically, and the long-side joints should fall on the vertical keel; it should be fixed with self-tapping screws, the spacing between the peripheral screws should not be greater than 200mm, and the distance between the screws in the middle part should not be greater than 300mm. The distance from the edge of the board should be 10-16mm.
  Key 5. When installing gypsum board, it should be fixed from the middle of the board to the four sides of the board. The nail head is slightly buried in the board; the nail hole should be rust-proof and flattened with gypsum putty.
  Sixth, the seam of gypsum board is generally 3~6mm. The gypsum board should be filled with putty at the T-shaped or cross-shaped junction, if it is an internal corner, and a joint tape should be attached. If it is an external corner, it should be protected.

Recommend Products