Six key steps to install toilet cubicle partition
The first step in the installation of the toilet cubicle partition: draw a line to install the fixed plate
Find a suitable position on the wall and draw the center line of the fixing plate. Usually, you need to install 6 corners on the fixing plate, install them on the plate as needed, and then punch holes in the corresponding position on the center line of the wall, and place the Put the plastic race sleeve into the hole, and then fix the fixing plate to the wall with expansion screws.
The second step of toilet partition installation: install and adjust the base
According to the pre-designed construction drawings, find the base position on the floor of the bathroom and draw the center line, and then fix the base (the base position is about 3CM from the edge of the partition board)
The third step of toilet partition installation: install the partition board
The first two steps of work are to pave the way for the installation of the partition board. The function of the fixing board and the base is to fix the partition board. Put the partition board on the adjustment base, and then adjust the height of the base to make the partition board close to each other. Fix the board on the wall, and then fine-tune the height of the base so that the partition board has a certain distance from the ground, about 7CM-10CM, after making sure that the height and bottom are at the same level, use a level to determine the level, and after everything is adjusted, use screws to fix the partition The plate is fixed on the fixed plate and the adjustment base.
The fourth step of toilet partition installation: install the pull rod
Cut and fix according to the actual length of the compartment. When the straight rod is connected flatly, a circular connecting sleeve and a pressing spring sheet must be installed in the pipe to ensure that the joint is flat and firm. beautiful. For the 90-degree corner tie rod of the compartment, the 90-degree corner joint of aluminum alloy injection molding is used to connect the tie rods at both ends of the corner. Use the cabochon wall fixing sleeve to fix the terminal rod on the wall with screws. Use screws to connect the pull rod to the upper edge of the column and fix it together.
The fifth step of toilet partition installation: install the column
Use screws to fix the tie rod fixing piece to the top of the middle of the column, and use the L-shaped fixing piece to fix the column and the partition board into one wall column - draw a straight line on the wall that is perpendicular to the ground, and use an electric drill on the line. 3. Drill holes outside, pre-embed plastic plugs in the holes, and make sure that they are perpendicular to the ground. Use screws and L-shaped fixing pieces to fix the wall column on the wall at a height of 145 meters above the ground. Terminal column--Fix the upper edge tie rod fixing piece and L-shaped side piece on the terminal column, and then fix this plate on the partition board with screws
The sixth step of toilet partition installation: install the door leaf
Fix the hinges on the column, usually 2-3, and then install the corresponding number of hinges at the corresponding positions on the door leaf, lift the door leaf lightly, place the automatic return nylon seat in the hinge seat, adjust the position, and open and close the door Check that the door leaf can be opened and closed freely, and check the adjustment until you are satisfied.
Find a suitable position on the wall and draw the center line of the fixing plate. Usually, you need to install 6 corners on the fixing plate, install them on the plate as needed, and then punch holes in the corresponding position on the center line of the wall, and place the Put the plastic race sleeve into the hole, and then fix the fixing plate to the wall with expansion screws.
The second step of toilet partition installation: install and adjust the base
According to the pre-designed construction drawings, find the base position on the floor of the bathroom and draw the center line, and then fix the base (the base position is about 3CM from the edge of the partition board)
The third step of toilet partition installation: install the partition board
The first two steps of work are to pave the way for the installation of the partition board. The function of the fixing board and the base is to fix the partition board. Put the partition board on the adjustment base, and then adjust the height of the base to make the partition board close to each other. Fix the board on the wall, and then fine-tune the height of the base so that the partition board has a certain distance from the ground, about 7CM-10CM, after making sure that the height and bottom are at the same level, use a level to determine the level, and after everything is adjusted, use screws to fix the partition The plate is fixed on the fixed plate and the adjustment base.
The fourth step of toilet partition installation: install the pull rod
Cut and fix according to the actual length of the compartment. When the straight rod is connected flatly, a circular connecting sleeve and a pressing spring sheet must be installed in the pipe to ensure that the joint is flat and firm. beautiful. For the 90-degree corner tie rod of the compartment, the 90-degree corner joint of aluminum alloy injection molding is used to connect the tie rods at both ends of the corner. Use the cabochon wall fixing sleeve to fix the terminal rod on the wall with screws. Use screws to connect the pull rod to the upper edge of the column and fix it together.
The fifth step of toilet partition installation: install the column
Use screws to fix the tie rod fixing piece to the top of the middle of the column, and use the L-shaped fixing piece to fix the column and the partition board into one wall column - draw a straight line on the wall that is perpendicular to the ground, and use an electric drill on the line. 3. Drill holes outside, pre-embed plastic plugs in the holes, and make sure that they are perpendicular to the ground. Use screws and L-shaped fixing pieces to fix the wall column on the wall at a height of 145 meters above the ground. Terminal column--Fix the upper edge tie rod fixing piece and L-shaped side piece on the terminal column, and then fix this plate on the partition board with screws
The sixth step of toilet partition installation: install the door leaf
Fix the hinges on the column, usually 2-3, and then install the corresponding number of hinges at the corresponding positions on the door leaf, lift the door leaf lightly, place the automatic return nylon seat in the hinge seat, adjust the position, and open and close the door Check that the door leaf can be opened and closed freely, and check the adjustment until you are satisfied.